• Water Conservancy

    Please contact us for more information.

    broken image
    Shuangfengsi Reservoir Project in Chengde City
    Chengde Shuangfengsi reservoir is the No. 1 water conservancy project in Hebei Province. It is a large class II project focusing on urban flood control and taking into account the comprehensive utilization of ecological environment, urban water supply and power generation. The designed total reservoir capacity is 137.3 million cubic meters, flood regulation capacity is 73.8 million cubic meters, effective capacity is 45.1 million cubic meters, and the installed capacity of the power station is 1580 KW.
    broken image
    Xinjiang Dashixia Water Conservancy Project
    The construction of the Xinjiang Dashixia Water Conservancy Project started in November 2019, and the construction contents include a retaining dam, a spillway, a flood discharge tunnel, and a water diversion and power generation system. The reservoir has a total storage capacity of 1.174 billion cubic meters and an installed capacity of 750000 kW; The main dam is a concrete slab gravel dam with a maximum dam height of 247m. The total investment of the project is USD 1.382 billion.
    broken image
    Taihu Reservoir, Xunwu County, Jiangxi
    The Taihu Reservoir Project is a medium-sized reservoir that focuses on water supply and has comprehensive benefits such as irrigation and flood control. The reservoir controls a basin area of 42.8 square kilometers, a total storage capacity of 23.84 million cubic meters, and a total investment of US$110 million. The daily water supply capacity of the project can reach 55,300 cubic meters, and the annual water supply capacity can reach 20.8 million cubic meters.
    broken image
    Central Yunnan Water Diversion Project
    The total length of various buildings of the project is 755.44 kilometers, of which the total length of the main water delivery channel is 664.24 kilometers, there are a total of 58 main tunnels with a length of 611.99 kilometers, and 120 construction tunnels with a length of 91.2 kilometers. The total investment of the project is USD 120.07 and the total construction period is 96 months. The water-receiving area involves 34 water-receiving communities in six prefectures along the main water delivery canal, benefiting a land area of 36,900 square kilometers, and a population of approximately 11.12 million directly benefited.
    broken image
    Xinjiang Hetian, Yulong, Kashi Water Conservancy Project
    The total storage capacity of the reservoir is 536 million cubic meters, and the installed capacity of the power station is 200 MW. It has the functions of flood control, irrigation, ecological water delivery, and power generation. The total project investment is US$1.212 billion and the construction period is 96 months. The normal storage level of the reservoir is 2,170 meters, the dead water level is 2,080 meters, and the adjusted storage capacity is 427 million cubic meters. It has an annual adjustment capacity.
    broken image
    Wenshan Qingshuihe Water Conservancy Project in Yunnan Province
    The normal storage level of Qingshuihe Reservoir is 1392 meters, the total storage capacity is 126 million cubic meters, the maximum dam height is 97 meters, the dam axis length is 400 meters, and the installed capacity of the power station behind the dam is 7MW. The total installed capacity of the pumping station is 35.5MW, and the total length of the water transmission line is 216km. The total investment is USD 768 million.
    broken image
    Diversion from Yellow River to Jining River Project in Qinghai Province
    The project includes two parts, a water diversion project and a water supply project. The total static investment of the project is USD 5.75 billion, and the construction period is 8 years. The project development tasks are urban domestic water supply, industrial water supply, agricultural irrigation water supply and improvement of the ecological environment. Involving 412 administrative villages in 53 townships in Qinghai Province.
    broken image
    Acquisition of Assets of Yingnahe Reservoir in Dalian, Liaoning
    The total investment of the project is USD 77 million. After the project is completed and combined with the Zhuanjiaolou Reservoir, the urban water supply capacity of the reservoir will be increased to 200 million cubic meters, and the annual design capacity for downstream agricultural irrigation and township water supply will be 29 million cubic meters. The main projects include heightening and widening of overflow dams and retaining dams; dam foundation anti-seepage grouting and consolidation grouting; construction of spill gates on the top of overflow dams; new diversion tunnels and upper dam roads.
    broken image
    Liaoning Dahuofang Reservoir emergency link to Dalian pipeline
    The PPP project of Dahuofang Reservoir emergency pipeline is 165.07 kilometers long with a designed annual water supply capacity of 300 million cubic meters, and the scope of activated assets is about US$615 million. In order to maximize the inventory of assets, the Dahuofang PPP project sets the transfer target as a 20-year concession of assets, and does not involve the transfer of asset ownership. The government can maximize the vitalization of water conservancy assets and avoid a series of procedures such as the registration of ownership changes after the change of property rights..
    broken image
    Expansion of the Sanjiang Diversion Canal of the Urban Flood Control Project in Shangrao City, Jiangxi Province
    The total investment of the project is approximately US$127 million. The project has a total length of 7.23km and a total land area of 67.986 hectares. It is a project integrating flood control, drainage, water diversion, ecology and leisure.
    broken image
    Preliminary Planning Consultation for Guangxi Yulin Longyun Water Distribution Project
    The total investment of the project is US$695 million. The project focuses on irrigation and water supply, and takes into account comprehensive utilization of ecological water replenishment and power generation. The main task in the near future is ecological water replenishment. The project connects the Beiliu River and the Nanliu River. The Beiliu River with abundant water resources is used to solve the problems of irrigation, urban and rural water supply, and ecological water use in Beiliu City, Yuzhou District, Fumian District, Yudong New District, Luchuan County and other urban and surrounding areas.