• Hydorpower

    Please contact us for more details.

    broken image
    Jinsha River Yinjiang Hydropower Station
    The Yinjiang Hydropower Station is located near the intersection of the Jinsha River and the Yalong River in the urban area of Panzhihua City. It is the last hydropower station in the upstream section of the cascade development of the Jinsha River Hydropower Station. It is connected to the Jinsha Hydropower Station at the top and the Wudongde Hydropower Station at the bottom. The installed capacity is 345MW, and the annual power generation capacity is 1.55 billion kWh. The total construction period is 60 months. The static investment is 69 Million USD.
    broken image
    Zhejiang Tongbai Pumped Storage Power Station
    Tongbai Pumped Storage Power Station is located in Tiantai County in the east of Zhejiang Province, about 150km away from Hangzhou City . It is an ideal peak-shaving power source for the East China Power Grid. It is a pumped storage site with ideal topography, geology, and water source. Its Shangshui Reservoir has installed four 300,000 kilowatt generators, generating 34.3 million kilowatts per year. The total installed capacity of its Lower Reservoir is 1.2 million kilowatts, and the designed annual average power generation capacity is 2.118 billion kWh.
    broken image
    Xinjiang Kizilsu River Tarilega Hydropower Station
    The dam site of the Tarilega Hydropower Station is located in the Xinjiang Uygur Autonomous Region. It is a hydropower project on the Kezi River that is mainly used for power generation. The normal water storage level is 2250m, the corresponding storage capacity is 33.1 million cubic meters, and the installed capacity is 4×11.25MW. The 110kv switch station is arranged at the back of the auxiliary plant and is an outdoor layout.
    broken image
    Bini à Warak Hydropower Station in Cameron
    The Bini à Warak Hydropower Station is located in the Adamawa Region of Cameroon and adopts the dual control mode (abbreviated as: CCAG contract mode) combining the DB contract and the local CCAG contract. The contract value is US$356 million, the total installed capacity is 75MW, and the total construction period is 48 months.
    broken image
    Soubre Hydropower Station in Cote d’Ivoire
    Soubre hydropower station in Côte d’Ivoire is located at the Nawa waterfall on the Sassandra river. It is the core project of the national energy balance strategy of Côte d’Ivoire. The total installed capacity is 275 MW, the total investment is 571.98 million US dollars, and the total construction period is 56.5 months. The annual generating capacity of the hydropower station is 1190 GWh.
    broken image
    Patuca III Hydropower Station in Honduras
    Patuca III Hydropower Project is located at downstream 5 km on Patura River, Honduras, Central America and 50 km from capital of the largest province, Olancho. Annual average flow in dam region is 134 m³/s, and after completion, it can generate electricity 104 MW. This hydro-junction consists of RCC gravity dam, flood discharge system and diversion and power generation system.
    broken image
    Hubei Huaqing Electric Power Company and Hydropower Project Restructuring Consultation
    The total installed capacity of the power station is 450,000 kilowatts. Two sets of 225,000 kilowatt Francis turbine generators will be built. The dam of the power station is 219 meters high. The project dynamic investment is 538 million US dollars. The normal storage level of the reservoir is 470m, the dead water level is 427m, the restricted water level during the flood season is 459.7m, the total storage capacity is 1.366 billion cubic meters, and the flood control storage capacity is 200 million cubic meters. It has the function of regulating water volume for multi-years.
    broken image
    Consulting on SDIC Power's Acquisition of 6 Hydropower Stations in Gansu Province
    SDIC Power Holdings Co., Ltd. (referred to as "SDIC Power", stock code "600886") is a state-owned backbone enterprise directly managed by the central government and listed on the Shanghai Stock Exchange. A high-quality power supply structure based on water and supplemented by thermal power, wind power and photovoltaics. Its outstanding investment, control and capital operation capabilities, as well as the strong support of the major shareholder SDIC, make it one of the most efficient and effective integrated energy companies in China and the third largest listed hydropower blue chip company in China.
    broken image
    China Datang Hubei Nanzhang River Basin Hydropower Development Planning Consultation
    The total investment of the Zhangjiaping Pumped Storage Power Station in Nanzhang County, Hubei Province is 1.468 billion US dollars and the total installed capacity is 1.8 million kWh. After the project is completed and put into operation, it will be the largest investment project in Nanzhang County's history.
    broken image
    Fujian Xianyou Pumped Storage Power Station
    Xianyou Pumped-storage Power Station is the first large-scale pumped-storage power station in Fujian Province, with a total installed capacity of 1200MW and a designed annual average power generation of 1.896 billion kWh. The power station is connected to the Fujian power grid through two 500kV high-voltage transmission lines. The project is located in the load center and power center of Fujian power grid. The upper and lower reservoirs are about 2km away, the utilization drop is about 440m, and the distance to height ratio is only 4.6.
    broken image
    State Grid Xinyuan Hongping Pumped Storage Power Station
    The installed capacity is 2400mw, which is constructed in two phases. The total investment of phase I is US $655 million. The installed capacity of the project is 1200mW. Four 300000 KW pumped storage units are installed in the project. After completion, the annual power generation will reach 2 billion kwh. After the completion of the project, the annual power generation of the power station can exceed 4 billion kwh.
    broken image
    China Southern Power Grid Corporation Huizhou Pumped Storage Power Station
    The power station is a large-capacity pure pumped storage power station that serves the Guangdong power grid. The normal storage level of the upper reservoir is 762m, the dead water level is 740m, and the adjusted storage capacity is 27.4 million cubic meters; the normal storage level of the lower reservoir is 231m, the dead water level is 205m, the adjusted storage capacity is 27.67 million cubic meters, the installed capacity is 2400MW, and the average water level is 532.40m. The energy storage capacity of the power station is 34065.3 MWh.
    broken image
    Xinjiang Bacun Hydropower Station
    Bacun hydropower station is located on the left bank of Kizilsu River in Wuhe Shalu Township, Wuqia County, and on a relatively flat site on the left bank about 7.8km downstream of the power house of Xiate hydropower station. The average power generation of the power station is 299.44 million KWh, and the installed capacity is proposed to be 84MW.
    broken image
    Guizhou Tuanpo Hydropower Station
    Guizhou Tuanpo Hydropower Station adopts water diversion development. The installed capacity of the power station is 80,000 KW, with three installed units, and the annual power generation capacity is 330 million KWh.
    broken image
    Guangxi Changzhou Water Conservancy Hub
    The riverbed workshops in Neijiang and Waijiang have installed a total of 15 bulb tubular hydro-generator units with a single unit capacity of 42MW. The total installed capacity is 630MW. The annual average power generation is 3.014 billion KWh, and the installed utilization hours are 4,916 hours. The power generation is 1.532 billion KWh, accounting for 49.4% of the average power generation for many years. The maximum water level of the power station is 16 m, the minimum water level is 3 m, and the design water level is 9.5 m. The power station is sent out in 220kv, one line from Neijiang to 220kv Pinglang Substation, and two lines from Outer River to Cangwu 220kv substation.